Create Work Package¶
Creating a field-executable work package (for example a FIWP or CWP) brings together the scope, materials, documents, and approvals a crew needs.
Steps (outline)¶
- Create the package from its type/template under the right parent.
- Select tags from the 1D list, 2D drawings, or the 3D model.
- Review the automatic MTO and attach linked documents.
- Apply cost codes, and generate a 3D viewpoint (and markups if needed).
- Route it through the approval workflow.
- Issue it — progress is then tracked by tag and package (see X4D Progressing).
Note
Confirm the exact steps and add screenshots.